Its own gas and the sun
Jordan
Open this slide on the globePeeringDB lists 4 data-center facilities in Jordan, in Amman and Aqaba, and in September 2026 Aqaba Digital Hub, which runs the largest, launched the country’s first locally hosted AI compute platform. Mindstream Energy plans an AI campus at Al-Risha that starts at 70 MW in 2027 and scales toward about 400 MW, on contracted natural gas and its own generation rather than the grid. In 2025 natural gas made 56 percent of Jordan’s electricity, renewables 26 percent, and oil shale 15 percent; the national strategy aims for 40 percent renewable by 2035.
- 26%
- of electricity from renewables, 2025
- 400 MW
- planned at Al-Risha
Sources
- PeeringDB, Facilities, 2026-10-01.
- Carrington Malin, Middle East AI News, Jordan launches first AI compute platform, September 16, 2026.
- Mindstream Energy (PR Newswire), Mindstream Energy Builds Execution Ecosystem Behind Jordan’s Planned 400 MW AI-Ready Campus, 2026.
- Jordan Ministry of Energy and Mineral Resources, Jordan Energy Sector Strategy 2025–2035, 2026.
- Enerdata, Jordan approves 2025-2035 energy strategy to expand gas and renewables, August 28, 2026.